SA SurveyAnchor
State Guides › Montana › K-223 (K0223)

Montana K-223 Plan of Correction Guide

K0223 · Egress Deficiencies

Build K-223 Plan & Binder →
✓ 2025–26 MT Citations: 9
✓ Common Audit Schedule: weekly for 4 weeks
✓ Checklist Source: CMS Life Safety Code

In Montana, state surveyors recorded 9 citations for K0223 (K-223: Egress Deficiencies) across recent 2025-2026 skilled nursing facility inspections. Recent citations in Montana were most active in Flathead, Big Horn, Yellowstone counties. To clear an onsite revisit without repeat deficiencies, Maintenance Director or designee teams typically pair immediate resident or building remediation with signed staff shift huddles and weekly for 4 weeks audit logs reviewed by the monthly QAPI committee.

Active MT Counties: Flathead County (3) → Big Horn County (2) → Yellowstone County (1) → Valley County (1) → Powder River County (1) →

What Surveyors Check Onsite

  • Are physical building zones cited under K0223 inspected on every shift and logged in the maintenance binder?
  • Have maintenance staff verified and documented immediate physical repair with dated work orders?
  • Are weekly audit logs signed by the Maintenance Director and reviewed at monthly QAPI meetings?

3-Question Hallway Spot-Quiz

Review with nurses & CNAs during your 5-minute shift huddle:

  1. If you spot an equipment or corridor safety issue related to K-223, how do you report an urgent maintenance order?
  2. Where are weekly Life Safety inspection logs kept when state surveyors arrive?
  3. What safety check happens on your unit before ending your shift?

Approved State Plan Examples for K0223

Concordia at Rp Home (PA)
Spot-checks: weekly × 4 weeks ✓ Passed Re-Inspection

1) New Door and/or latch will be replaced at the linen supply closet to ensure self-closing. 2)New Door and/or latch will be replaced at the third floor nutrition room to ensure self-closing.…

View Full Plan Text (08/17/2026)
K0223 Correction Date: 10/01/2026 1) New Door and/or latch will be replaced at the linen supply closet to ensure self-closing. 2)New Door and/or latch will be replaced at the third floor nutrition room to ensure self-closing. 3) Maintenance will audit all doors and then audit quarterly to ensure all doors are self-closing as required by regulation.
Asbury Health Center (PA)
Spot-checks: weekly × 4 weeks ✓ Passed Re-Inspection

The two doors identified will be fixed before POC completion date. All other self-closing doors were inspected and confirmed to be functioning. NHA or designee will educate maintenance…

View Full Plan Text (08/10/2026)
K0223 Correction Date: 09/16/2026 The two doors identified will be fixed before POC completion date. All other self-closing doors were inspected and confirmed to be functioning. NHA or designee will educate maintenance director on door requirements and routine inspections. Maintenance director or designee will audit self-closing doors and submit repair orders as needed weekly x 4 weeks, then monthly x 2 months. Results will be reviewed and adjusted at QAPI as needed.
Customize & Print 4-Sheet Revisit Binder →