SA SurveyAnchor
State Guides › Maine › K-341 (K0341)

Maine K-341 Plan of Correction Guide

K0341 · Smoke Deficiencies

Build K-341 Plan & Binder →
✓ 2025–26 ME Citations: 6
✓ Common Audit Schedule: weekly for 4 weeks
✓ Checklist Source: CMS Life Safety Code

In Maine, state surveyors recorded 6 citations for K0341 (K-341: Smoke Deficiencies) across recent 2025-2026 skilled nursing facility inspections. Recent citations in Maine were most active in Cumberland, York, Piscataquis counties. To clear an onsite revisit without repeat deficiencies, Maintenance Director or designee teams typically pair immediate resident or building remediation with signed staff shift huddles and weekly for 4 weeks audit logs reviewed by the monthly QAPI committee.

Active ME Counties: Cumberland County (2) → York County (1) → Piscataquis County (1) → Penobscot County (1) → Knox County (1) →

What Surveyors Check Onsite

  • Are physical building zones cited under K0341 inspected on every shift and logged in the maintenance binder?
  • Have maintenance staff verified and documented immediate physical repair with dated work orders?
  • Are weekly audit logs signed by the Maintenance Director and reviewed at monthly QAPI meetings?

3-Question Hallway Spot-Quiz

Review with nurses & CNAs during your 5-minute shift huddle:

  1. If you spot an equipment or corridor safety issue related to K-341, how do you report an urgent maintenance order?
  2. Where are weekly Life Safety inspection logs kept when state surveyors arrive?
  3. What safety check happens on your unit before ending your shift?

Approved State Plan Examples for K0341

Capitol Rehabilitation and Healthcare Center (PA)
Spot-checks: weekly × 4 weeks ✓ Passed Re-Inspection

1. Plan Review contacted and requested that a plan including a drawing and narrative be submitted through the DCI portal for the installation of a pull station within five feet of the Therapy…

View Full Plan Text (11/24/2025)
K0341 Correction Date: 01/13/2026 1. Plan Review contacted and requested that a plan including a drawing and narrative be submitted through the DCI portal for the installation of a pull station within five feet of the Therapy Gym rear exit door. The Center will be requesting a Time Limited Waiver. 2. The Plant Operations staff will be educated on the pull station requirements. 3. Five random audits will be completed weekly for four weeks then monthly for three months on the placement of manual fire pull stations to ensure they meet the requirement of five feet. All audits will be shared with the QAPI committee for further recommendations
Kadima Rehabilitation & Nursing at New Castle (PA)
Spot-checks: weekly × 4 weeks Approved Filing

Corrective Action for Residents Affected: No residents were directly affected by the deficient practice. An audit of all pull stations has been completed on 5/29/2026. No other non-compliant…

View Full Plan Text (05/12/2026)
K0341 Correction Date: 07/07/2026 Corrective Action for Residents Affected: No residents were directly affected by the deficient practice. An audit of all pull stations has been completed on 5/29/2026. No other non-compliant pull stations were observed. Upon identification of the deficiency, the facility contacted its licensed fire alarm contractor to evaluate the cited locations. Work to begin on 6/2/2026 The pull stations near resident room and the lobby will be adjusted to comply with the required mounting height of 42 to 48 inches above the finished floor. A compliant manual fire alarm pull station will be installed within five feet of the emergency exit door Work on the above will be completed as soon as possible
Customize & Print 4-Sheet Revisit Binder →