In Massachusetts, state surveyors recorded 10 citations for K0241 (K-241: Egress Deficiencies) across recent 2025-2026 skilled nursing facility inspections. Recent citations in Massachusetts were most active in Norfolk, Plymouth, Berkshire counties. To clear an onsite revisit without repeat deficiencies, Maintenance Director or designee teams typically pair immediate resident or building remediation with signed staff shift huddles and weekly for 4 weeks audit logs reviewed by the monthly QAPI committee.

Active MA Counties: Norfolk County (8) → Plymouth County (1) → Berkshire County (1) →

What Surveyors Check Onsite

  • Are physical building zones cited under K0241 inspected on every shift and logged in the maintenance binder?
  • Have maintenance staff verified and documented immediate physical repair with dated work orders?
  • Are weekly audit logs signed by the Maintenance Director and reviewed at monthly QAPI meetings?

3-Question Hallway Spot-Quiz

Review with nurses & CNAs during your 5-minute shift huddle:

  1. If you spot an equipment or corridor safety issue related to K-241, how do you report an urgent maintenance order?
  2. Where are weekly Life Safety inspection logs kept when state surveyors arrive?
  3. What safety check happens on your unit before ending your shift?

Approved State Plan Examples for K0241

Majestic Care of McCordsville (IN)
Spot-checks: monthly × 4 weeks ✓ Passed Re-Inspection

Corrective Action for the Finding: An FSES evaluation will be conducted to determine if the facility is in compliance per Life Safety Code. Identification of Other Residents/Areas Potentially…

View Full Plan Text (08/11/2026)
K0241 Completion Date: 09/30/2026 K241 Corrective Action for the Finding: An FSES evaluation will be conducted to determine if the facility is in compliance per Life Safety Code. Identification of Other Residents/Areas Potentially Affected: No residents have the potential to be affected. Two staff have the potential to be affected but none were identified. Systemic Correction: An FSES was conducted on 9/04/2026 to ensure the facility receives a passing score, and the amount of basement egress is permitted. An FSES will be conducted yearly to ensure the facility is in compliance. Monitoring: The QAPI committee will monitor monthly X 12 months the on-going implementation of current facility policy and procedures to ensure appropriate and consistent implementation, which meet the standards and quality of care needs for the facility and the
Abbeyville Skilled Nursing and Rehabilitation Center (PA)
Spot-checks: weekly × 4 weeks ✓ Passed Re-Inspection

1. Areas cited cannot be corrected due to construction of facility.Education provided to maintenance staff on requirements of egress. Facility requests that DSI conduct a FSES survey. 2.…

View Full Plan Text (03/17/2026)
K0241 Correction Date: 05/13/2026 1. Areas cited cannot be corrected due to construction of facility.Education provided to maintenance staff on requirements of egress. Facility requests that DSI conduct a FSES survey. 2. Audits to be completed one areas listed weekly x 4 weeks and then monthly x 2 months to ensure path to egress is free from obstructions. 3. Results of audits to be brought to QAPI committee until substantial compliance is demonstrated. 4. Date of compliance: 5/13/2026