✓ 2025–26 IN Citations: 182
✓ Common Audit Schedule: weekly for 4 weeks
✓ Checklist Source: LSC-K0918

In Indiana, state surveyors recorded 182 citations for K0918 (K-918: Electrical Systems - Essential Electric System Maintenance and Generator Testing) across recent 2025-2026 skilled nursing facility inspections. Recent citations in Indiana were most active in Marion, St. Joseph, Lake counties. To clear an onsite revisit without repeat deficiencies, Maintenance Director or designee teams typically pair immediate resident or building remediation with signed staff shift huddles and weekly for 4 weeks audit logs reviewed by the monthly QAPI committee.

Active IN Counties: Marion County (21) → St. Joseph County (14) → Lake County (13) → Allen County (9) → Porter County (8) →

What Surveyors Check Onsite

  • Are weekly generator visual inspections (fuel, battery electrolyte/specific gravity, coolant, oil) logged every single week?
  • Are monthly 30-minute dynamic load tests (>= 30% nameplate kW or exhaust temperature threshold) documented for all 12 months?
  • Are transfer switch time-delay seconds (< 10 seconds to restore emergency power) recorded on every monthly test sheet?

3-Question Hallway Spot-Quiz

Review with nurses & CNAs during your 5-minute shift huddle:

  1. Which color electrical outlets at the nurses' station and resident rooms stay powered by the emergency generator?
  2. Where is the emergency generator inspection binder stored if a Life Safety surveyor asks to review the last 12 monthly load tests?
  3. Within how many seconds must emergency generator power come on if utility power fails?

Approved State Plan Examples for K0918

Majestic Care of McCordsville (IN)
Spot-checks: weekly × 4 weeks ✓ Passed Re-Inspection

Corrective Action for the Finding: The facility reviewed the weekly exercising documentation cannot be retroactively completed. Any required generator exercising, testing, inspection,…

View Full Plan Text (08/11/2026)
K0918 Completion Date: 09/30/2026 K0918 Corrective Action for the Finding: The facility reviewed the weekly exercising documentation cannot be retroactively completed. Any required generator exercising, testing, inspection, maintenance, or documentation that was non-compliant was reviewed, along with identifying corrective steps to maintain full compliance moving forward. Identification of Other Residents/Areas Potentially affected: The facility recognizes that a deficiency involving the generator and related essential electrical system components may potentially affect all residents, staff, and visitors during a power interruption or emergency. The facility therefore reviewed its exercise and testing schedule and documentation process to ensure compliance with this mandatory requirement. Systemic Correction: Tutorial with the Maintenance Director regarding documentation for monthly generator and essential testing results, generator logs, and other applicable records will be maintained in the facility's Life Safety/ Generator records and in TELS. The Maintenance Director will provide monthly testing of the generator starting battery before 9/30/2026. The Maintenance Director will work with Generator Systems to complete the 3-year, 4-hour testing on or before 9/30/2026. Monitoring: The QAPI Committee will monitor the monthly generator battery testing X 6 months to ensure we are in compliance with monthly testing. The QAPI Committee will review the 3-year, 4-hour generator testing yearly in January to schedule Generator Systems for the 3-year, 4-hour test when needed. The ED/Designee will oversee.
Richland Bean Blossom Health Care Center (IN)
Spot-checks: weekly × 4 weeks ✓ Passed Re-Inspection

A maintenance records review was conducted for weekly generator inspections. All residents residing in the facility have the potential to be affected by a deficiency in this practice. The TELS…

View Full Plan Text (04/27/2026)
K0918 Completion Date: 05/30/2026 K0918 A maintenance records review was conducted for weekly generator inspections. All residents residing in the facility have the potential to be affected by a deficiency in this practice. The TELS monitoring system will be utilized for monitoring and documentation of weekly generator inspections. Maintenance Director and Maintenance Assistant were re-educated on required compliance for weekly generator testing. Audits for monitoring weekly generator inspections will be conducted by the Executive Director or designee monthly x 6 months or until 100% compliance is achieved. Results of these audits will be presented to the QA committee, and any recommendations for changes or updates by the QA committee will be put into place as indicated. These systemic changes will be
Hickory Creek at Peru (IN)
Spot-checks: weekly × 4 weeks ✓ Passed Re-Inspection

Weekly generator testing has remained ongoing. How other residents having the potential to be affected by the same deficient practice will be identified and what corrective action(s) will be…

View Full Plan Text (01/15/2026)
K0918 Completion Date: 02/15/2026 What corrective action(s) will be accomplished for those residents found to have been affected by the deficient practice: Weekly generator testing has remained ongoing. How other residents having the potential to be affected by the same deficient practice will be identified and what corrective action(s) will be taken: What measures will be put into place and what systemic changes will be made to ensure that the deficient practice does not recur: We have continued with our weekly generator testing. We have added to our Preventative Maintenance Program monthly conductance testing for our sealed generator batteries. How the corrective action(s) will be monitored to ensure the deficient practice will not recur: Weekly generator testing will continue and completed per weekly TELS schedule. Monthly generator conductance testing will be completed monthly. Documentation will be completed for compliance. Testing compliance will be reviewed during our monthly Safety Meetings and Quality Assurance Meetings. If and monthly conductance test for our emergency generator is missing, the Safety and Quality Assurance Committees will complete an action plan for compliance.