Indiana K-363 Plan of Correction Guide
K0363 · Corridor Doors Positive Latching and Free of Propping Wedges
Build K-363 Plan & Binder →
✓
2025–26 IN Citations: 152
✓
Common Audit Schedule: monthly for 4 weeks
✓
Checklist Source: CMS Life Safety Code
In Indiana, state surveyors recorded 152 citations for K0363 (K-363: Corridor Doors Positive Latching and Free of Propping Wedges) across recent 2025-2026 skilled nursing facility inspections. Recent citations in Indiana were most active in Marion, Lake, Hamilton counties. To clear an onsite revisit without repeat deficiencies, Maintenance Director or designee teams typically pair immediate resident or building remediation with signed staff shift huddles and monthly for 4 weeks audit logs reviewed by the monthly QAPI committee.
What Surveyors Check Onsite
- Are physical building zones cited under K0363 inspected on every shift and logged in the maintenance binder?
- Have maintenance staff verified and documented immediate physical repair with dated work orders?
- Are weekly audit logs signed by the Maintenance Director and reviewed at monthly QAPI meetings?
3-Question Hallway Spot-Quiz
Review with nurses & CNAs during your 5-minute shift huddle:
- If you spot an equipment or corridor safety issue related to K-363, how do you report an urgent maintenance order?
- Where are weekly Life Safety inspection logs kept when state surveyors arrive?
- What safety check happens on your unit before ending your shift?
Approved State Plan Examples for K0363
Arbor Grove Village (IN)
Spot-checks: monthly × 4 weeks
✓ Passed Re-Inspection
1. What corrective action will be accomplished for those residents found to have been affected by the deficient practice; No residents were affected by this alleged deficient practice. Doors…
View Full Plan Text (05/27/2026)
K0363
Completion Date: 06/25/2026
1. What corrective action will be accomplished for those residents found to have been affected by the deficient practice; No residents were affected by this alleged deficient practice. Doors for RR#408 and RR# 206 were adjusted and device to hold doors open were removed. (See attachment J, K)
2. How other residents having Maintenance director in-serviced on 5/28/26 on corridor doors to have no impediments or obstructions preventing them from closure. Doors for RR#408 and RR # 206 were adjusted and device to hold doors open were removed(5/28/26). (See attachment)
3. What measures will be put into place and what systemic changes will be made to ensure that the deficient practice does not recur; Maintenance director or designee will use Life safety code/QAPI tool to audit door closures to ensure deficient practice does not recur.
4. How the corrective action will be monitored to ensure the deficient practice will not recur, i.e., what quality assurance program will be put into place. Maintenance Director or designee will complete ongoing monitoring via QAPI program with meetings held bi-monthly and is overseen by the Executive Director. The review. The results of these audits will be reviewed by the QAPI committee, if threshold of 100% is not achieved an action plan will be revised/completed.
Brickyard Healthcare - Fountainview Care Center (IN)
Spot-checks: monthly × 6 months
Approved Filing
How other residents having the potential to be affected by the same deficient practice will be identified and what residents near therapy or laundry. The holes in the therapy storage door and…
View Full Plan Text (10/07/2026)
K0363
Completion Date: 10/26/2026
K363 - Corridor - Doors - what corrective action(s) will be accomplished for those residents found to have been affected by the deficient practice; The holes in the therapy storage door and the door to the laundry room storage were repaired/filled with 4 hour intumescent fire caulk. - how other residents having the potential to be affected by the same deficient practice will be identified and what residents near therapy or laundry. The holes in the therapy storage door and the door to the laundry room storage were repaired/filled with 4 hour intumescent fire caulk. - what measures will be put into place and what systemic changes will be made to ensure that the deficient practice does not recur; A task was added to TELS to repair penetrations in any door immediately. - how the corrective action(s) will be monitored to ensure the deficient practice will not recur, i.e., what quality assurance program will be put into place; and Maintenance will present the audit tools to the QAPI committee monthly for 6 months. Thereafter, if
Majestic Care of North Vernon (IN)
Spot-checks: weekly × 4 weeks
Approved Filing
All residents had the potential to be affected by the deficient practice. A facility-wide inspection of corridor doors was conducted to identify any holes, penetrations, or damage that could…
View Full Plan Text (08/11/2026)
K0363
Completion Date: 08/28/2026
POC-K0363 What corrective action(s) will The hole in the A Hall soiled linen room corridor door was immediately repaired, restoring the door's ability to resist the passage of smoke. The door was inspected following repair and found to be in compliance. How other residents having the potential to be affected by the same deficient practice will be identified and what corrective actions(s) will be taken? All residents had the potential to be affected by the deficient practice. A facility-wide inspection of corridor doors was conducted to identify any holes, penetrations, or damage that could impair smoke resistance. Any concerns identified were immediately corrected. What measures will be put into place and what systematic changes will be made to ensure that educated regarding corridor door requirements and maintaining smoke-resistant integrity of corridor doors. Maintenance director will audit for corridor door's ability to resist the passage of smoke. How the corrective action(s) will be monitored to ensure the deficient practice will not recur, i.e., what quality assurance program will be put into place? The Executive Director or designee will conduct weekly audits of corridor doors for six months to verify doors remain free of holes, penetrations, or damage that could impair smoke resistance. Any concerns identified will be immediately corrected. Audit results will be reviewed through QAPI. By what date the systematic changes for each deficiency will be completed? What corrective action(s) will be accomplished for those residents found to have been affected by the deficient practice? A facility-wide annual inspection and testing of all fire door assemblies was completed. Written documentation identifying each fire door assembly, inspection date, inspection results, and any corrective action taken was completed and maintained for review. Any deficiencies identified during the inspection process were immediately corrected. How other residents having the potential to be affected by the same deficient practice will be identified and what corrective actions(s) will be taken? All residents had the potential to be affected by the testing documentation. Annual inspections and testing were completed and documented for all fire door assemblies. Any concerns identified were immediately corrected. What measures will be put into place and what systematic changes will be made to ensure that the deficient practice does not recur? The Maintenance Director was educated on requirements for annual fire door inspection and testing, including documentation requirements. A standardized fire door inspection checklist was implemented. How the corrective action(s) will be monitored to ensure the deficient practice will not recur, i.e., what quality assurance program will be put into place? maintained in accordance with requirements. Any concerns identified will be immediately corrected. Results will be reviewed through the facility QAPI process until substantial compliance is achieved and maintained. By what date the systematic changes for each deficiency will be completed? 8/28/2026