Indiana K-353 Plan of Correction Guide

K0353 · Sprinkler System - Maintenance, Inspection, and 18-Inch Storage Clearance

Build K-353 Plan & Binder →
✓ 2025–26 IN Citations: 256
✓ Common Audit Schedule: weekly for 4 weeks
✓ Checklist Source: LSC-K0353

In Indiana, state surveyors recorded 256 citations for K0353 (K-353: Sprinkler System - Maintenance, Inspection, and 18-Inch Storage Clearance) across recent 2025-2026 skilled nursing facility inspections. Recent citations in Indiana were most active in Marion, Lake, Allen counties. To clear an onsite revisit without repeat deficiencies, Maintenance Director or designee teams typically pair immediate resident or building remediation with signed staff shift huddles and weekly for 4 weeks audit logs reviewed by the monthly QAPI committee.

Active IN Counties: Marion County (27) → Lake County (18) → Allen County (13) → St. Joseph County (12) → Hamilton County (11) →

What Surveyors Check Onsite

  • Do staff maintain at least 18 inches of vertical safety clearance below sprinkler heads in dietary, linen, and supply closets?
  • Are sprinkler heads in resident rooms and corridors clean and free of paint, lint, or hanging items during maintenance inspection?
  • Are quarterly flow tests and annual sprinkler inspection logs current in the facility maintenance binder?

3-Question Hallway Spot-Quiz

Review with nurses & CNAs during your 5-minute shift huddle:

  1. How many inches of open safety space must staff keep below sprinkler heads on top shelves of storage closets?
  2. Can staff ever hang privacy curtains, clothes, or wires from sprinkler piping in a resident room?
  3. Where does the maintenance director keep quarterly and annual sprinkler inspection records?

Approved State Plan Examples for K0353

Majestic Care of McCordsville (IN)
Spot-checks: weekly × 4 weeks ✓ Passed Re-Inspection

Corrective Action for the Finding: The facility reviewed the deficiency of Sprinkler System - Maintenance and Testing. The water storage tank will need to have temperature tested weekly to…

View Full Plan Text (08/11/2026)
K0353 Completion Date: 09/30/2026 K353 Corrective Action for the Finding: The facility reviewed the deficiency of Sprinkler System - Maintenance and Testing. The water storage tank will need to have temperature tested weekly to ensure the proper water temperature. The storage tank interior shall be inspected every 3 -yrs for signs of pitting, corrosion, spalling, rot, and other forms of deterioration. Identification of Other Residents/Areas Potentially Affected: All residents, staff and visitors have the potential to be affected but none were identified. Systemic Correction: Pittsburgh Tank & Tower Group will complete an inspection of the tank on or before 9/30/2026. Documentation will be provided in TELS that service has been performed and completed. Monitoring:
Richland Bean Blossom Health Care Center (IN)
Spot-checks: weekly × 4 weeks ✓ Passed Re-Inspection

A maintenance records review was conducted for the timely completion of the weekly dry sprinkler gauge inspection documentation. All residents in the facility have the potential to be affected…

View Full Plan Text (04/27/2026)
K0353 A maintenance records review was conducted for the timely completion of the weekly dry sprinkler gauge inspection documentation. All residents in the facility have the potential to be affected by a deficiency in this practice. The TELS System will be utilized weekly for timely completion of all tasks with documentation completed and retained for records. Re-education has been conducted with the Maintenance Director and Maintenance Assistant. as well as confirmation that all suspended ceiling tiles are in place will be performed by the Maintenance Director or designee monthly x 6 months or until 100% compliance is achieved. Results of these audits will be presented to the QA committee, and any recommendations for changes or updates by the QA committee will be put into place as indicated. These systemic changes will be in place on or before 05/30/2026
Brickyard Healthcare - Twelfth Street Care Center (IN)
Spot-checks: weekly × 4 weeks ✓ Passed Re-Inspection

A weekly wet sprinkler gauge check was initiated with 1 wet pressure gauge reading. A weekly wet sprinkler valve check was affected by this alleged deficient practice. A weekly TELS task was…

View Full Plan Text (12/09/2025)
K0353 Completion Date: 02/03/2026 A weekly wet sprinkler gauge check was initiated with 1 wet pressure gauge reading. A weekly wet sprinkler valve check was affected by this alleged deficient practice. A weekly TELS task was added to Ensure that the wet sprinkler system valve is in the open position. A weekly Task was added to TELS for a wet sprinkler gauge check with a log for the sprinkler gauge reading. A weekly task was added to TELS to Monitor and record the pressure readings on the gauges to ensure that normal air and water pressures are being maintained. Insert values on log. Inspect the condition of the gauges to verify there are no leaks or evidence of tampering. A weekly dry sprinkler gauge check was added to TELS to Verify dry system sprinkler valve is in the open position and free from defects. Closing this task is receipt of completion of inspection. Maintenance will report to QAPI no less than quarterly in perpetuity regarding life safety issues.