✓ 2025–26 IN Citations: 182
✓ Common Audit Schedule: monthly for 6 months
✓ Checklist Source: CMS Life Safety Code

In Indiana, state surveyors recorded 182 citations for K0324 (K-324: Smoke Deficiencies) across recent 2025-2026 skilled nursing facility inspections. Recent citations in Indiana were most active in Lake, Marion, St. Joseph counties. To clear an onsite revisit without repeat deficiencies, Maintenance Director or designee teams typically pair immediate resident or building remediation with signed staff shift huddles and monthly for 6 months audit logs reviewed by the monthly QAPI committee.

Active IN Counties: Lake County (14) → Marion County (12) → St. Joseph County (11) → Allen County (11) → Elkhart County (9) →

What Surveyors Check Onsite

  • Are physical building zones cited under K0324 inspected on every shift and logged in the maintenance binder?
  • Have maintenance staff verified and documented immediate physical repair with dated work orders?
  • Are weekly audit logs signed by the Maintenance Director and reviewed at monthly QAPI meetings?

3-Question Hallway Spot-Quiz

Review with nurses & CNAs during your 5-minute shift huddle:

  1. If you spot an equipment or corridor safety issue related to K-324, how do you report an urgent maintenance order?
  2. Where are weekly Life Safety inspection logs kept when state surveyors arrive?
  3. What safety check happens on your unit before ending your shift?

Approved State Plan Examples for K0324

Arbor Grove Village (IN)
Spot-checks: daily × 4 weeks ✓ Passed Re-Inspection

1. What corrective action will be accomplished for those residents found to have been affected by the deficient practice; No residents were affected by this alleged deficient practice. A…

View Full Plan Text (05/27/2026)
K0324 Completion Date: 06/25/2026 1. What corrective action will be accomplished for those residents found to have been affected by the deficient practice; No residents were affected by this alleged deficient practice. A disconnect switch was installed to provide deactivation of cooktop or range when not in use on 6/11/26. (See attachment E) All residents could potentially be affected by this alleged deficient practice. Maintenance director and activity staff in-serviced on stove use and disconnection procedures and proper storage of activity items. 3. What measures will be put into place and what systemic changes will be made to ensure that the deficient practice does not recur; Maintenance director or designee will use Life safety code/QAPI tool to audit that deactivation of power to cooktop or range is compliant. 4. How the corrective action will be monitored to ensure the deficient practice will not recur, i.e., what quality assurance program will be put into place. Maintenance Director or designee will complete ongoing monitoring via QAPI program with meetings held bi-monthly and is overseen by the Executive Director. The Maintenance Director will audit daily (5x week) for 4 weeks, monthly x 6 months, using Life 100% is not achieved an action plan will be revised/completed.
Hickory Creek at Peru (IN)
Spot-checks: monthly × 6 months ✓ Passed Re-Inspection

Serving and re-education to culinary staff along with facility leadership. What measures will be put into place or what systemic changes you will make to ensure that the alleged deficient…

View Full Plan Text (01/15/2026)
K0324 Completion Date: 02/03/2026 It is the policy of this facility to ensure cooking equipment is protected in accordance with NFPA Standard for Ventilation Control and Fire Protection of Commercial Cooking Operations. It is also the policy of this facility to have all culinary staff aware of the location and use of the UL 300 Hood Suppression System What corrective action(s) will be accomplished for those residents found to have been affected by the alleged the use of the UL 300 Hood Suppression System. How will you identify other residents having the potential to be affected by the same alleged deficient practice and what corrective action will be taken. All residents have the potential to be affected by this same deficient practice. The Maintenance Director provided in-serving and re-education to culinary staff along with facility leadership. What measures will be put into place or what systemic changes you will make to ensure that the alleged deficient practice does not recur. The Maintenance Director will conduct checks with the culinary staff to ensure their knowledge of how to use the UL 300 Hood Suppression System. The Maintenance Director will continue to review the UL 300 Hood Suppression System with all new hires during their new hire Facility Safety Walk. be accomplished for those residents found to have been affected by the alleged deficient practice. All residents have the potential to be affected by this deficient practice. The Maintenance Director has contacted the vendor to come and reroute the sprinkler heads to ensure their spray pattern is not obstructed in the dietary storage room and the administrators closet. How will you identify other residents having the potential to be affected by the same alleged deficient practice and what corrective action will be taken. All residents have the potential to be affected by this deficient practice. All sprinkler heads were checked by the Maintenance Director to ensure there were no obstructions. What measures will be put into place or what systemic changes you will make to ensure that the alleged deficient practice does not not obstructed. The Maintenance Director will inspect sprinkler heads to ensure proper spray pattern. How the corrective action(s) will be monitored to ensure the alleged deficient practice will not recur, i.e., what quality assurance program will be put into place. Once vendor reroutes the sprinkler heads the inspection will be added to our Preventative Maintenance Program. Which will be reviewed and discussed during our Safety Committee Meeting and during our Quality Assurance Committee Meetings. Sprinkler heads in the Dry Storage room will be checked monthly for 6 months, If 100% is not achieved an action plan will be developed.