SA SurveyAnchor
State Guides › Illinois › K-911 (K0911)

Illinois K-911 Plan of Correction Guide

K0911 · Gas, Vacuum, and Electrical Systems Deficiencies

Build K-911 Plan & Binder →
✓ 2025–26 IL Citations: 18
✓ Common Audit Schedule: weekly for 4 weeks
✓ Checklist Source: CMS Life Safety Code

In Illinois, state surveyors recorded 18 citations for K0911 (K-911: Gas, Vacuum, and Electrical Systems Deficiencies) across recent 2025-2026 skilled nursing facility inspections. Recent citations in Illinois were most active in Cook, Will, MC Henry counties. To clear an onsite revisit without repeat deficiencies, Maintenance Director or designee teams typically pair immediate resident or building remediation with signed staff shift huddles and weekly for 4 weeks audit logs reviewed by the monthly QAPI committee.

Active IL Counties: Cook County (13) → Will County (1) → MC Henry County (1) → Lake County (1) → La Salle County (1) →

What Surveyors Check Onsite

  • Are physical building zones cited under K0911 inspected on every shift and logged in the maintenance binder?
  • Have maintenance staff verified and documented immediate physical repair with dated work orders?
  • Are weekly audit logs signed by the Maintenance Director and reviewed at monthly QAPI meetings?

3-Question Hallway Spot-Quiz

Review with nurses & CNAs during your 5-minute shift huddle:

  1. If you spot an equipment or corridor safety issue related to K-911, how do you report an urgent maintenance order?
  2. Where are weekly Life Safety inspection logs kept when state surveyors arrive?
  3. What safety check happens on your unit before ending your shift?

Approved State Plan Examples for K0911

Asbury Health Center (PA)
Spot-checks: weekly × 4 weeks ✓ Passed Re-Inspection

The electrical wiring identified will be fixed before POC completion date. All other electrical wiring in boiler room were inspected and confirmed to be functioning. NHA or designee will…

View Full Plan Text (08/10/2026)
K0911 Correction Date: 09/16/2026 The electrical wiring identified will be fixed before POC completion date. All other electrical wiring in boiler room were inspected and confirmed to be functioning. NHA or designee will educate maintenance director on electrical wiring requirements and routine inspections. Maintenance director or designee will boiler room electrical panel and submit repair orders as needed weekly x 4 weeks, then monthly x 2 months. Results will be reviewed and adjusted at QAPI as needed.
Fairlane Gardens Nursing and Rehab at Reading (PA)
Spot-checks: monthly × 4 weeks ✓ Passed Re-Inspection

1) Electrical panels have been secured throughout the facility. 2) Maintenance director will be educated on securing electrical panels from unauthorized entry, in four smoke zones of the…

View Full Plan Text (07/29/2026)
K0911 Correction Date: 09/15/2026 1) Electrical panels have been secured throughout the facility. 2) Maintenance director will be educated on securing electrical panels from unauthorized entry, in four smoke zones of the component 3) NHA/designee will conduct random audits monthly and following any electrical work is completed to ensure electric panels are secure. 4) A summary of the audit's findings will be submitted to the QAPI committee for recommendations.
Customize & Print 4-Sheet Revisit Binder →