Illinois K-353 Plan of Correction Guide

K0353 · Sprinkler System - Maintenance, Inspection, and 18-Inch Storage Clearance

Build K-353 Plan & Binder →
✓ 2025–26 IL Citations: 241
✓ Common Audit Schedule: weekly for 4 weeks
✓ Checklist Source: LSC-K0353

In Illinois, state surveyors recorded 241 citations for K0353 (K-353: Sprinkler System - Maintenance, Inspection, and 18-Inch Storage Clearance) across recent 2025-2026 skilled nursing facility inspections. Recent citations in Illinois were most active in Cook, Du Page, St. Clair counties. To clear an onsite revisit without repeat deficiencies, Maintenance Director or designee teams typically pair immediate resident or building remediation with signed staff shift huddles and weekly for 4 weeks audit logs reviewed by the monthly QAPI committee.

Active IL Counties: Cook County (82) → Du Page County (11) → St. Clair County (7) → Kane County (7) → Vermilion County (5) →

What Surveyors Check Onsite

  • Do staff maintain at least 18 inches of vertical safety clearance below sprinkler heads in dietary, linen, and supply closets?
  • Are sprinkler heads in resident rooms and corridors clean and free of paint, lint, or hanging items during maintenance inspection?
  • Are quarterly flow tests and annual sprinkler inspection logs current in the facility maintenance binder?

3-Question Hallway Spot-Quiz

Review with nurses & CNAs during your 5-minute shift huddle:

  1. How many inches of open safety space must staff keep below sprinkler heads on top shelves of storage closets?
  2. Can staff ever hang privacy curtains, clothes, or wires from sprinkler piping in a resident room?
  3. Where does the maintenance director keep quarterly and annual sprinkler inspection records?

Approved State Plan Examples for K0353

Concordia at Rp Home (PA)
Spot-checks: weekly × 4 weeks ✓ Passed Re-Inspection

1) Mongovi Fire Service to repair faulty control valve and 2 sprinklery switches on 8/28/26. Workorder on file with NHA. 2) Escutcheon Plates replaced on office area to reported locations.…

View Full Plan Text (08/17/2026)
K0353 Correction Date: 10/01/2026 1) Mongovi Fire Service to repair faulty control valve and 2 sprinklery switches on 8/28/26. Workorder on file with NHA. 2) Escutcheon Plates replaced on office area to reported locations. Workers completing ceiling tile work re-educated to requirement of sprinkler heads. 3) Escutcheon Plates replaced on 3rd Floor nears front stairwell area to reported locations. Workers completing ceiling tile work re-educated to requirement of sprinkler heads. 4) Escutcheon Plates replaced on foyer to reported locations. Workers completing ceiling tile work re-educated to requirement of sprinkler heads. 5) All sprinkler head audited to ensure escutcheon places to ensure located in place. 6) Wires removed from the sprinkler line near resident room upon discovery. 7) Supply room on the third floor ceiling tile will be replaced to cover conduit. work order available. 8. Penetration in the electoral equipment room applied to meet requirement. Work order on file with NHA. 9_ QAPI Committee aware of citations and updates
Majestic Care of McCordsville (IN)
Spot-checks: weekly × 4 weeks ✓ Passed Re-Inspection

Corrective Action for the Finding: The facility reviewed the deficiency of Sprinkler System - Maintenance and Testing. The water storage tank will need to have temperature tested weekly to…

View Full Plan Text (08/11/2026)
K0353 Completion Date: 09/30/2026 K353 Corrective Action for the Finding: The facility reviewed the deficiency of Sprinkler System - Maintenance and Testing. The water storage tank will need to have temperature tested weekly to ensure the proper water temperature. The storage tank interior shall be inspected every 3 -yrs for signs of pitting, corrosion, spalling, rot, and other forms of deterioration. Identification of Other Residents/Areas Potentially Affected: All residents, staff and visitors have the potential to be affected but none were identified. Systemic Correction: Pittsburgh Tank & Tower Group will complete an inspection of the tank on or before 9/30/2026. Documentation will be provided in TELS that service has been performed and completed. Monitoring: