SA SurveyAnchor
State Guides › Iowa › K-161 (K0161)

Iowa K-161 Plan of Correction Guide

K0161 · Construction Deficiencies

Build K-161 Plan & Binder →
✓ 2025–26 IA Citations: 25
✓ Common Audit Schedule: weekly for 4 weeks
✓ Checklist Source: CMS Life Safety Code

In Iowa, state surveyors recorded 25 citations for K0161 (K-161: Construction Deficiencies) across recent 2025-2026 skilled nursing facility inspections. Recent citations in Iowa were most active in Monona, Henry, Webster counties. To clear an onsite revisit without repeat deficiencies, Maintenance Director or designee teams typically pair immediate resident or building remediation with signed staff shift huddles and weekly for 4 weeks audit logs reviewed by the monthly QAPI committee.

Active IA Counties: Monona County (3) → Henry County (3) → Webster County (1) → Warren County (1) → Wapello County (1) →

What Surveyors Check Onsite

  • Are physical building zones cited under K0161 inspected on every shift and logged in the maintenance binder?
  • Have maintenance staff verified and documented immediate physical repair with dated work orders?
  • Are weekly audit logs signed by the Maintenance Director and reviewed at monthly QAPI meetings?

3-Question Hallway Spot-Quiz

Review with nurses & CNAs during your 5-minute shift huddle:

  1. If you spot an equipment or corridor safety issue related to K-161, how do you report an urgent maintenance order?
  2. Where are weekly Life Safety inspection logs kept when state surveyors arrive?
  3. What safety check happens on your unit before ending your shift?

Approved State Plan Examples for K0161

Margaret E. Moul Home (PA)
Spot-checks: weekly × 4 weeks ✓ Passed Re-Inspection

1. The horizontal fire door located on the 2nd floor East Hall above the drop ceiling by the Unit 3 Nursing Station is not used by facility staff or vendors, nor does it lead to an area that…

View Full Plan Text (08/24/2026)
K0161 Correction Date: 09/30/2026 1. The horizontal fire door located on the 2nd floor East Hall above the drop ceiling by the Unit 3 Nursing Station is not used by facility staff or vendors, nor does it lead to an area that has any building systems that may require maintenance or service. Therefore, it will be sealed off with 1hr fire rated sheetrock and then sealed with fire rated caulk to close it off. 2. All horizontal fire doors will be inspected to ensure they are not accessible and properly covered and sealed with 1hr fire rated sheetrock, and fire rated caulk. 3. Director of Environmental Services, or designee will audit horizontal fire doors quarterly for 3 quarters to ensure compliance. Findings will be reported to the Quality Assessment and Assurance Committee for recommendations and need for further audits.
Majestic Care of McCordsville (IN)
Spot-checks: weekly × 4 weeks ✓ Passed Re-Inspection

Corrective Action for the Finding: The facility reviewed the deficiency for Building Construction Type and Height. The two-story portion of the facility is in question and found to be…

View Full Plan Text (08/11/2026)
K0161 Completion Date: 09/30/2026 K161 Corrective Action for the Finding: The facility reviewed the deficiency for Building Construction Type and Height. The two-story portion of the facility is in question and found to be non-compliant. An FSES evaluation will be completed. Identification of Other Residents/Areas Potentially Affected: All residents, staff, and visitors have the potential to be affected by the structural building, but none were identified. Systemic Correction: An FSES evaluation was conducted on 9/04/2026. An FSES will be conducted yearly to stay in compliance with Life Safety Code. Monitoring: The QAPI committee will standards and quality of care needs for the facility and the residents.
Customize & Print 4-Sheet Revisit Binder →