Build K-919 Plan & Binder →
✓ 2025–26 GA Citations: 7
✓ Common Audit Schedule: weekly for 4 weeks
✓ Checklist Source: CMS Life Safety Code

In Georgia, state surveyors recorded 7 citations for K0919 (K-919: Gas, Vacuum, and Electrical Systems Deficiencies) across recent 2025-2026 skilled nursing facility inspections. Recent citations in Georgia were most active in Ware, Telfair, Oconee counties. To clear an onsite revisit without repeat deficiencies, Maintenance Director or designee teams typically pair immediate resident or building remediation with signed staff shift huddles and weekly for 4 weeks audit logs reviewed by the monthly QAPI committee.

Active GA Counties: Ware County (1) → Telfair County (1) → Oconee County (1) → Long County (1) → Colquitt County (1) →

What Surveyors Check Onsite

  • Are physical building zones cited under K0919 inspected on every shift and logged in the maintenance binder?
  • Have maintenance staff verified and documented immediate physical repair with dated work orders?
  • Are weekly audit logs signed by the Maintenance Director and reviewed at monthly QAPI meetings?

3-Question Hallway Spot-Quiz

Review with nurses & CNAs during your 5-minute shift huddle:

  1. If you spot an equipment or corridor safety issue related to K-919, how do you report an urgent maintenance order?
  2. Where are weekly Life Safety inspection logs kept when state surveyors arrive?
  3. What safety check happens on your unit before ending your shift?

Approved State Plan Examples for K0919

Embassy of Scranton (PA)
Spot-checks: weekly × 4 weeks ✓ Passed Re-Inspection

Any storage kept in the basement-level electrical room was relocated to ensure a clearance of 36 inches from electrical panels. The Maintenance Director/designee will audit the basement-level…

View Full Plan Text (05/26/2026)
K0919 Correction Date: 06/30/2026 Any storage kept in the basement-level electrical room was relocated to ensure a clearance of 36 inches from electrical panels. The Maintenance Director/designee will audit the basement-level electrical room weekly x 4, then monthly to ensure that a clearance of 36 inches from the electrical panels is maintained for any storage. These audits will be brought to the monthly QAPI committee meeting for further review and recommendations.
Pocopson Home (PA)
Spot-checks: weekly × 4 weeks ✓ Passed Re-Inspection

1. The junction box, located within the West Wing tunnel (closest to the fire alarm strobe) has been covered with a junction box cover plate. The Maintenance department staff will inspect all…

View Full Plan Text (04/01/2026)
K0919 Correction Date: 04/02/2026 1.The junction box, located within the West Wing tunnel (closest to the fire alarm strobe) has been covered with a junction box cover plate. The Maintenance department staff will inspect all electrical junction boxes for the correct installation of covers during their weekly maintenance rounds. Audit results will be reported to the Quality Improvement/Infection Control Committee Preparation and submission of this Plan of Correction is required by State and Federal law. This Plan of Correction does not constitute an admission for purposes of general liability, professional malpractice or any other court proceeding.