Georgia K-511 Plan of Correction Guide

K0511 · Utilities, HVAC, and Medical Gas Equipment Compliance

Build K-511 Plan & Binder →
✓ 2025–26 GA Citations: 188
✓ Common Audit Schedule: weekly for 4 weeks
✓ Checklist Source: CMS Life Safety Code

In Georgia, state surveyors recorded 188 citations for K0511 (K-511: Utilities, HVAC, and Medical Gas Equipment Compliance) across recent 2025-2026 skilled nursing facility inspections. Recent citations in Georgia were most active in Fulton, Richmond, Cobb counties. To clear an onsite revisit without repeat deficiencies, Maintenance Director or designee teams typically pair immediate resident or building remediation with signed staff shift huddles and weekly for 4 weeks audit logs reviewed by the monthly QAPI committee.

Active GA Counties: Fulton County (12) → Richmond County (7) → Cobb County (7) → De Kalb County (6) → Glynn County (5) →

What Surveyors Check Onsite

  • Are physical building zones cited under K0511 inspected on every shift and logged in the maintenance binder?
  • Have maintenance staff verified and documented immediate physical repair with dated work orders?
  • Are weekly audit logs signed by the Maintenance Director and reviewed at monthly QAPI meetings?

3-Question Hallway Spot-Quiz

Review with nurses & CNAs during your 5-minute shift huddle:

  1. If you spot an equipment or corridor safety issue related to K-511, how do you report an urgent maintenance order?
  2. Where are weekly Life Safety inspection logs kept when state surveyors arrive?
  3. What safety check happens on your unit before ending your shift?

Approved State Plan Examples for K0511

Centennial Healthcare and Rehabilitation Center (PA)
Spot-checks: monthly × 4 weeks ✓ Passed Re-Inspection

Blanks were installed in the basement transformer room electrical panels. Circuit breakers have the potential to be effected. Maintenance will be educated on maintaining protection of…

View Full Plan Text (07/15/2026)
K0511 Correction Date: 09/01/2026 Blanks were installed in the basement transformer room electrical panels. Circuit breakers have the potential to be effected. Maintenance will be educated on maintaining protection of electrical equipment. Random audits will be conducted by the Maintenance or designee to ensure protection of electrical equipment is maintained Monthly x2 with reports to QAPI
Lakeland Rehab and Healthcare Center (IN)
Spot-checks: monthly × 6 months ✓ Passed Re-Inspection

Utilities - Gas and Electric The facility requests paper compliance for this citation. This plan of correction is the facility's credible allegation of compliance. Preparation and/or execution…

View Full Plan Text (06/18/2026)
K0511 Completion Date: 07/20/2026 K0511 - Utilities - Gas and Electric The facility requests paper compliance for this citation. This plan of correction is the facility's credible allegation of compliance. Preparation and/or execution of this plan of correction does not constitute admission or agreement by the provider of the truth of the facts alleged or conclusions set forth in the statement of deficiencies. The plan of correction is prepared and/or executed solely because it is required by the provisions of federal and state law. 1)Immediate actions taken for other residents: Visitors, staff, and residents that reside in the community have the potential to be affected by the alleged deficient practice. 3)Measures put into place/System changes Electrical Panel was locked 4)How the corrective action will be monitored: The Maintenance Director/Designee will audit 5 areas monthly for 6 months and present to the QAPI Committee during QAPI Meetings to ensure completion of any new necessary updates and compliance. The report will be reviewed in Quality Assurance Meeting monthly for 6 months or until 100% compliance is achieved. The QA Committee will identify any trends or patterns and make recommendations to revise the plan of correction as indicated. 20th, 5)Date of Compliance: July 2026