SA SurveyAnchor
State Guides › Connecticut › K-347 (K0347)

Connecticut K-347 Plan of Correction Guide

K0347 · Smoke Deficiencies

Build K-347 Plan & Binder →
✓ 2025–26 CT Citations: 14
✓ Common Audit Schedule: weekly for 4 weeks
✓ Checklist Source: CMS Life Safety Code

In Connecticut, state surveyors recorded 14 citations for K0347 (K-347: Smoke Deficiencies) across recent 2025-2026 skilled nursing facility inspections. Recent citations in Connecticut were most active in South Central Ct, Southeastern Ct, Naugatuck Vly counties. To clear an onsite revisit without repeat deficiencies, Maintenance Director or designee teams typically pair immediate resident or building remediation with signed staff shift huddles and weekly for 4 weeks audit logs reviewed by the monthly QAPI committee.

Active CT Counties: South Central Ct County (3) → Southeastern Ct County (2) → Naugatuck Vly County (2) → Lower Ct River Vly County (2) → Capitol County (2) →

What Surveyors Check Onsite

  • Are physical building zones cited under K0347 inspected on every shift and logged in the maintenance binder?
  • Have maintenance staff verified and documented immediate physical repair with dated work orders?
  • Are weekly audit logs signed by the Maintenance Director and reviewed at monthly QAPI meetings?

3-Question Hallway Spot-Quiz

Review with nurses & CNAs during your 5-minute shift huddle:

  1. If you spot an equipment or corridor safety issue related to K-347, how do you report an urgent maintenance order?
  2. Where are weekly Life Safety inspection logs kept when state surveyors arrive?
  3. What safety check happens on your unit before ending your shift?

Approved State Plan Examples for K0347

Graduate Post Acute (PA)
Spot-checks: weekly × 4 weeks ✓ Passed Re-Inspection

1. A fire watch was initiated for the fifth-floor Physical Therapy area while the system was impaired. The ceiling assembly was restored, and the affected smoke detectors were properly…

View Full Plan Text (08/11/2026)
K0347 Correction Date: 09/23/2026 1. A fire watch was initiated for the fifth-floor Physical Therapy area while the system was impaired. The ceiling assembly was restored, and the affected smoke detectors were properly supported, installed, and tested for correct operation on September 23rd. 2. The Maintenance Director/designee inspected all construction areas to ensure smoke detectors were properly installed and working in enclosed rated ceilings. Identified deficiencies were corrected. 3. Maintenance staff and contractors were educated on protecting smoke detection systems during construction and implementing interim fire-safety measures when systems are impaired. 4. The Maintenance Director/designee will audit construction areas weekly until construction is completed. Audit findings will be addressed and submitted to the Quality Assurance Performance Improvement Committee for further review and recommendation.
Quality Life Services - New Castle (PA)
Spot-checks: monthly × 3 months ✓ Passed Re-Inspection

All battery operated smoke detectors have been labeled with install date from install paperwork. Monthly testing has been added to TELs Battery Operated Smoke detector Policy has been obtained…

View Full Plan Text (05/27/2026)
K0347 Correction Date: 07/14/2026 All battery operated smoke detectors have been labeled with install date from install paperwork. Monthly testing has been added to TELs Battery Operated Smoke detector Policy has been obtained and reviewed Monthly audits for 3 months times 3 will be completed to ensure compliance. Results will be brought to QAPI for review.
Customize & Print 4-Sheet Revisit Binder →