Colorado K-927 Plan of Correction Guide

K0927 · Gas, Vacuum, and Electrical Systems Deficiencies

Build K-927 Plan & Binder →
✓ 2025–26 CO Citations: 15
✓ Common Audit Schedule: monthly for 4 weeks
✓ Checklist Source: CMS Life Safety Code

In Colorado, state surveyors recorded 15 citations for K0927 (K-927: Gas, Vacuum, and Electrical Systems Deficiencies) across recent 2025-2026 skilled nursing facility inspections. Recent citations in Colorado were most active in El Paso, Arapahoe, Larimer counties. To clear an onsite revisit without repeat deficiencies, Maintenance Director or designee teams typically pair immediate resident or building remediation with signed staff shift huddles and monthly for 4 weeks audit logs reviewed by the monthly QAPI committee.

Active CO Counties: El Paso County (3) → Arapahoe County (3) → Larimer County (2) → Adams County (2) → Weld County (1) →

What Surveyors Check Onsite

  • Are physical building zones cited under K0927 inspected on every shift and logged in the maintenance binder?
  • Have maintenance staff verified and documented immediate physical repair with dated work orders?
  • Are weekly audit logs signed by the Maintenance Director and reviewed at monthly QAPI meetings?

3-Question Hallway Spot-Quiz

Review with nurses & CNAs during your 5-minute shift huddle:

  1. If you spot an equipment or corridor safety issue related to K-927, how do you report an urgent maintenance order?
  2. Where are weekly Life Safety inspection logs kept when state surveyors arrive?
  3. What safety check happens on your unit before ending your shift?

Approved State Plan Examples for K0927

The Waters of Huntington Skilled Nursing Facility (IN)
Spot-checks: monthly × 4 weeks Approved Filing

It is the intent of the facility to ensure staff are properly trained on transfilling oxygen procedures to meet set standards. 1. CORRECTIVE ACTIONS TAKEN: 1. On 10/15/2026 the…

View Full Plan Text (09/24/2026)
It is the intent of the facility to ensure staff are properly trained on transfilling oxygen procedures to meet set standards. 1. CORRECTIVE ACTIONS TAKEN: 1. On 10/15/2026 the Administrator/DON/de signee conducted the annual training for all new staff and nursing staff for transfilling-liquid oxygen to meet set standards.The Administrator verified the training on 10/15/2026. ALL OTHERS WITH 2. POTENTAL TO BE AFFECTED: 1. All residents and all staff and visitors have the potential to be affected but none serviced the DON/ designee to ensure all new hires and existing nursing staff are trained on transfilling liquid oxygen annually to meet set standards. 2. Administrator/DON/de signee will ensure all new hires and existing nursing staff are trained on transfilling liquid oxygen as a part of the facility's Oxygen Policies and Procedures. If any issues are discovered, they will be addressed and resolved immediately.The DON/designee will review with the Administrator the results. MONITORING 4. CORRECTIVE ACTION: The inspection results 1. will be presented by the DON/designee to the Administrator monthly and the Administrator will present the inspection results at the monthly reviewed by the QA/PI Committee with subsequent plans of correction developed and implemented as deemed necessary to ensure compliance is maintained. This plan of correction constitutes our credible allegation of compliance with all regulatory requirements. Our date of compliance is 10/15/2026.
Hamilton Grove (IN)
Spot-checks: monthly × 4 weeks Approved Filing

The identified wall and ceiling penetrations in the oxygen transfilling room were sealed with approved fire-rated materials. The Maintenance Director verified repairs were completed and the…

View Full Plan Text (09/14/2026)
K0927 Completion Date: 10/23/2026 Plan of Correction - K0927 (Gas Equipment - Transfilling Cylinders) Hamilton Grove Deficiency: The oxygen transfilling room did not maintain the required one-hour fire-resistive rating due to unsealed wall and ceiling penetrations. 1. What corrective action(s) will be accomplished for those residents found to have been affected by the deficient practice? The identified wall and ceiling penetrations in the oxygen transfilling room were sealed with approved fire-rated materials. The Maintenance Director verified repairs were completed and the fire barrier integrity was restored. Because fire barrier deficiencies can impact the safety of the entire facility, all residents, staff, and visitors had the potential to be affected. The Maintenance Director inspected the oxygen transfilling room and other fire-rated areas for additional penetrations. Any deficiencies identified were corrected. 3. What measures will be put into place and what systemic changes will be made to ensure that the deficient practice does not recur? The facility updated its preventive maintenance program to include routine inspections of fire-rated walls, ceilings, and penetrations. The Maintenance Director and maintenance staff were educated on NFPA 99 fire barrier requirements and maintaining the integrity of fire-rated assemblies by the Administrator. A fire barrier inspection log was implemented to document inspections and corrective actions. 4. How will the corrective action(s) be monitored to ensure the deficient practice will not audits of fire-rated barriers, including the oxygen transfilling room, for six months. Audit findings will be reviewed through the QAPI Committee monthly for six months. Any identified deficiencies will be corrected immediately, documented, and trended to prevent recurrence.